GS 1: Indian SocietyGS 2: International RelationsGS 3: Environment & EcologyGS 3: EconomyPrelims

Siang Dam: Why The Project To Counter China Faces Opposition In Arunachal, Pg11

Arunachal's Siang dam project sparks local protests over ecological and cultural threats, despite government's push to counter China's upstream water infrastructure.

Practice MCQs

825 Students attempted
Attempt Now

Key Highlights:

  • The proposed Siang Upper Multipurpose Project (SUMP) in Arunachal Pradesh faces strong opposition from indigenous Adi communities and local residents.
  • The 11,200 MW SUMP is envisioned as India's largest hydropower project, aimed at countering China's upstream dam on the Yarlung Tsangpo.
  • Protests, including a shutdown and rallies in Itanagar, highlight concerns over ecological, social, and cultural impacts on ancestral lands.
  • The Arunachal Pradesh government justifies the project as a national security imperative against potential "water bomb" threats from China.
  • The project is currently in the pre-feasibility survey stage, with the Chief Minister assuring no rushing and extensive consultations if it progresses.

Siang Upper Project.jpg

Siang Upper Project.jpg

Detailed Insights:

  • Plans to harness the Siang and Subansiri rivers date back to 1982, with the Brahmaputra Board initially proposing smaller projects.
  • Concerns over Chinese projects on the Yarlung Tsangpo (Siang in Tibet) emerged in 2013, shifting the focus to India's downstream user interests.
  • The SUMP gained prominence after China approved its 60,000 MW lower Yarlung Tsangpo hydropower project in December 2024.
  • Experts question the government's rationale, emphasizing the need for India to obtain public details and operational procedures of the Chinese project.
  • Local communities fear displacement and loss of livelihood, viewing the Siang river as culturally, economically, and socially vital.
  • The Chief Minister has assured that if the Pre-Feasibility Report (PFR) finds the project unfeasible, it will not proceed, and consultations will include Social Impact Assessment (SIA) and Environmental Impact Assessment (EIA).

Key Concepts Involved:

  • Pre-Feasibility Report (PFR): An initial study to assess the viability of a project before significant resources are committed.
  • Social Impact Assessment (SIA): A process to evaluate the social effects of a proposed project on people and communities.
  • Environmental Impact Assessment (EIA): A process to identify, predict, evaluate, and mitigate the environmental effects of a proposed project.
  • Downstream User Rights: The rights of a country or region located downstream on a river to receive a fair share of its water.
SuperKalam
SuperKalam is your personal mentor for UPSC preparation, guiding you at every step of the exam journey.

Download the App

Get it on Google PlayDownload on the App Store
Follow us

ⓒ Snapstack Technologies Private Limited