Key Highlights:

  • India currently has 24 nuclear power reactors in commercial operation with a total installed capacity of 8,780 MW.
  • The Plant Load Factor (PLF) of nuclear power plants has been higher than the average all-India Thermal Power Plant PLF (excluding gas-based plants) from 2019-20 to 2023-24.
  • KAPS-4 (Kakrapar Atomic Power Station Unit-4) commenced commercial operation in March 2024.
  • KAPS-3 (Kakrapar Atomic Power Station Unit-3) was commissioned in June 2023.

Detailed Insights:

  • The consistent high PLF of nuclear power plants highlights their reliability and efficiency in contributing to the national grid.
  • This performance is crucial for India's energy security and its strategy to diversify the power generation mix.
  • The commissioning of new units like KAPS-3 and KAPS-4 signifies the ongoing expansion and development in India's nuclear energy program.
  • The information was provided by Union Minister of State Dr. Jitendra Singh in a written reply in the Rajya Sabha.

Key Concepts Involved:

  • Nuclear Power Reactors: Devices that initiate and control a sustained nuclear chain reaction to generate heat, primarily for electricity production.
  • Plant Load Factor (PLF): The ratio of the actual energy output of a power plant over a period to its maximum possible energy output over the same period.
  • Thermal Power Plants: Power stations that generate electricity by converting heat energy, typically from burning fossil fuels like coal or gas.
SuperKalam
SuperKalam is your personal mentor for UPSC preparation, guiding you at every step of the exam journey.

Download the App

Get it on Google PlayDownload on the App Store
Follow us

ⓒ Snapstack Technologies Private Limited