Current Affairs14 Nov, 2026PIBIndia’s Renewable En…
GS 2: GovernanceGS 3: Environment & EcologyGS 3: EconomyPrelimsGS 3: Infrastructure: Energy, Ports, Roads, Airports, Railways etc.

India’s Renewable Energy Journey: Powering a Cleaner Future

India rapidly scales renewable energy to 308 GW, launching PM-Surya Ghar, PM-SSY, and National Green Hydrogen Mission for a sustainable, self-reliant energy future.

Practice MCQs

898 Students attempted
Attempt Now

Key Highlights:

  • India's non-fossil capacity reached 308 GW by July 2026, accounting for 55% of total installed capacity.
  • India ranks third globally in renewable energy installed capacity.
  • PM-Surya Ghar: Muft Bijli Yojana launched with ₹75,021 crore outlay for 1 crore households, commissioning 19.1 GW rooftop solar.
  • Pradhan Mantri Surya Sarovar Yojana approved with ₹5,070 crore to develop 5,000 MW of floating solar projects with energy storage.
  • National Green Hydrogen Mission targets 5 MMT production by 2030 with an outlay of ₹19,744 crore.
  • GOBARdhan scheme approved with ₹23,731 crore outlay to nearly ten-fold domestic Compressed Biogas (CBG) production.

Detailed Insights:

  • India's total installed power capacity increased from 249 GW in 2014 to approximately 560 GW by October 2026.
  • The country invested USD 63.7 billion in its renewable energy sector between July 2024 and June 2026.
  • The Bharat Renewable Energy Summit & Expo (BRESE) 2026 brought together global policymakers and industry leaders in New Delhi.
  • Solar power is now the largest component of India’s renewable energy capacity, reaching ~175 GW by October 2026.
  • India ranks fourth globally in installed wind power capacity, which stood at 59.20 GW as of October 2026.
  • The Union Cabinet approved a ₹7,453 crore Viability Gap Funding (VGF) scheme for 1 GW of offshore wind projects.
  • Bio-power capacity reached 11.75 GW, with 839 CBG plants registered and 210 commissioned.
  • Cumulative hydropower capacity is 57.49 GW, supported by the Small Hydro Power Development Scheme with a ₹2,584.60 crore outlay.
  • Indian companies have signed 5.5 lakh MTPA of Green Hydrogen offtake commitments since 2023, with over 70% earmarked for exports.
  • India launched 12 pilot projects for 70 hydrogen-powered vehicles and its first indigenous hydrogen fuel cell train in July 2026.
  • The National Policy on Geothermal Energy was notified in September 2025, estimating India's geothermal potential at around 10,600 MW.

Key Concepts Involved:

  • Viability Gap Funding (VGF): Financial support provided by the government to infrastructure projects that are economically justified but not financially viable.
  • Green Hydrogen: Hydrogen produced through electrolysis of water using renewable energy sources, resulting in zero carbon emissions.
  • Circular Bioeconomy: An economic model that aims to minimize waste and maximize resource utilization by reusing and recycling biological resources.
Previous4/4
SuperKalam
SuperKalam is your personal mentor for UPSC preparation, guiding you at every step of the exam journey.

Download the App

Get it on Google PlayDownload on the App Store
Follow us

ⓒ Snapstack Technologies Private Limited