GS 2: International RelationsGS 3: EconomyGS 1: Indian GeographyPrelims

Work resumes on Bhutan's hydro project funded by India, Pg15

India-funded Punatsangchhu-I hydropower project in Bhutan restarts after 7-year halt, boosting bilateral ties and energy cooperation.

Practice MCQs

833 Students attempted
Attempt Now

Key Highlights:

  • Work on the 1,200 MW Punatsangchhu-I hydropower project in Bhutan has resumed after a seven-year suspension.
  • India's Power Minister Manohar Lal attended the concrete pouring ceremony, marking the restart of construction.
  • The India-funded project, stalled since 2019 due to geological challenges, is expected to be completed in five years.

Detailed Insights:

  • The Punatsangchhu-I project is a significant example of Indo-Bhutan cooperation in the hydropower sector.
  • Geological challenges had caused significant delays and cost overruns since 2019, requiring extensive engineering solutions.
  • Completion of the project will boost Bhutan's power generation capacity and contribute to India's energy security.
  • Hydropower cooperation is a crucial aspect of the economic and diplomatic relations between India and Bhutan.

Key Concepts Involved:

  • Hydropower Project: A facility that generates electricity by harnessing the energy of moving water.
  • Bilateral Cooperation: Collaboration between two countries on areas of mutual interest.
Previous7/7
SuperKalam
SuperKalam is your personal mentor for UPSC preparation, guiding you at every step of the exam journey.

Download the App

Get it on Google PlayDownload on the App Store
Follow us

ⓒ Snapstack Technologies Private Limited